- Advertisement -

Visayas, Mindanao grids placed on red, yellow alerts amid widespread plant outages

- Advertisement -
Advertisement

POWER supply constraints triggered red and yellow alerts across the Visayas and Mindanao grids on Tuesday, August 11, following a wave of forced plant outages and restricted power imports, the National Grid Corporation of the Philippines (NGCP) reported.

The Visayas grid was elevated to red alert status from 3 p.m. to 8 p.m., a level indicating that power supply is insufficient to meet consumer demand and regulating requirements, exposing the region to potential rotating blackouts.

Yellow alerts—signaling insufficient operating reserves—were also enforced from 1 p.m. to 3 p.m. and 8 p.m. to 10 p.m.

According to NGCP, Visayas available capacity dropped to 2,123 megawatts (MW) against a projected peak demand of 2,418 MW.

Over 960 MW was stripped from the grid due to 29 offline power plants and 16 facilities operating at derated capacities.

Major contributors to the deficit include the continued unavailability of large coal-fired plants—Therma Visayas Inc. (TVI) Units 1 and 2, and Cebu Energy Development Corp. (CEDC) Unit 1—alongside recent forced outages at CPPC Unit 5, BDPP Unit 1, and Power Barges 101 and 104.

BASAHIN  Polish President Karol Nawrocki opens 5th Poland-Philippines IT Business Summit at iACADEMY in historic visit
Advertisement

Compounding the problem, power transfers from Mindanao were severely restricted. The Mindanao grid faced its own yellow alert from 10 a.m. to 8 p.m. with 777.7 MW unavailable.

Mindanao’s capacity was squeezed by emergency shutdowns at GNPower Kauswagan (GNPK) Unit 1 due to a boiler tube leak, ongoing maintenance at GNPK Unit 2, extended outages at SEC Unit 2, and a 40 MW capacity reduction at the Pulangi hydroelectric plant.

Peak demand in Mindanao was expected to reach 2,616 MW against an available capacity of 2,696 MW.

Addressing the supply strain, Department of Energy (DOE) Secretary Sharon Garin stated that the government is rolling out immediate, medium, and long-term solutions, including deploying power barges and battery energy storage systems over the next two years.

Garin also urged NGCP to finalize ancillary service contracts to integrate 250 MW of battery capacity to stabilize the Visayas grid.

Advertisement
- Advertisement -
Related news
Latest news
- Advertisement -
Business
- Advertisement -
IN CASE YOU MISSED IT

Cayetano pushes Senate measure to revive investments, create quality jobs

IN a bid to steer the Philippine economy back on track, Senate Minority Leader Alan Peter Cayetano has co-introduced a resolution establishing a dedicated...

President Marcos enjoins 1,150 Ilocos Norte TESDA graduates to drive economic growth

PRESIDENT Ferdinand “Bongbong” Marcos Jr. urged 1,150 new graduates from the Technical Education and Skills Development Authority (TESDA) to leverage their newly acquired competencies...

Philippines leads regional push for stronger public finance systems for children

THE Philippines has reaffirmed its leadership in advancing child-responsive public financial management by hosting a regional knowledge-sharing exchange aimed at optimizing public resources for...

Philippine Red Cross rolls out massive cash assistance for Sarangani earthquake survivors

THE Philippine Red Cross (PRC) has distributed a total of ₱7.43 million in Multipurpose Cash Grants to 743 families severely impacted by the recent...

San Juan City distributes free rubber shoes and PE uniforms to 13,000 students

MAYOR Francis Zamora spearheaded the distribution of free customized rubber shoes and physical education (PE) uniforms to 13,000 K–12 public school students on Monday,...

PCSO boosts 2026 PhilHealth contribution to ₱3.85 billion for universal health care

THE Philippine Charity Sweepstakes Office (PCSO) Board of Directors has approved an additional ₱1.16-billion allocation to the Philippine Health Insurance Corporation (PhilHealth) for 2026. This...
- Advertisement -